Submit observation proposals, including ToO and MWL requests.
Mock — PHS not yet connectedPlanned integration: Proposal Handling System (APC team)
{/* Integration landing, not a form: the PHS is APC's product — the spec
(§3.3.3) scopes this portal to integrating it, so we describe the
hand-off instead of imitating their submission UI. */}
Proposal Handling System
Submitting observation proposals — including Target of Opportunity (ToO)
and multi-wavelength (MWL) requests — happens in the Proposal Handling
System, built by the APC team and integrated into this portal.
What the portal contributes:
This menu entry, with a single sign-on hand-off (CTAO AAI).